Progress has been slow due to the weather, appointments, and the fact that we are rookie roof framers. The weather is cooler colder but not too bad, but it is the rain that is the problem. We worked on the roof one afternoon while the precipitation waffled back and forth between a mist and small rain drops. We finally quit when the deck started getting slippery because all of the leaves that fell in just 2 days.
The photo below was taken several days ago (so we are further along) and we are ready to put plywood sheathing on the gable end. We had to wait until we knew what our roof pitch would be before we could settle on a gable vent style. The house has two styles of gable vents and one of the vent styles is in the photo below and at the top of the photo.
Our roof pitch is one that doesn't have a ready made gable vent in this style so we are going with the style of gable vent in the photo below.
We can make the vent after we finish with the roof as long as we make the cut out for the vent before we sheath the roof.
So that is where we are with the roof but we are getting there. We are getting burned out on this project so the day we put down the felt paper and nail the drip edge on can't happen soon enough. The roof shingle part will be hired out.
We removed all the plants from the window boxes and the bareness is killing me so my plan is to fill one window box a day with evergreen cuttings. One year I waited too long and the soil was frozen solid so I had to use hot water to thaw it out. That was both a hot and cold mess.
Reuse Repurpose Recycle
No comments:
Post a Comment
Leave a comment here.....