Friday, December 28, 2018

Update on PVC Fascia Board Installation

Just a quick update because I need to get to bed because tomorrow we are going to start early.  Today was above normal temperature of 49 degrees!  Perfect outdoor working weather.  We did have some high winds last night and I spent about an hour today picking up branches and twigs.
The white PVC fascia board is installed on the east side and we are moving around to the back of the house.  This is the largest area of shingles and I hope that we can get it all re shingled this summer.  It will be our only project.  
We want to get the white PVC fascia board installed on the north side (where R is working in the photo above).   We will then go back and add the gutter in one continuous run from the short area of the new roof, then an inside corner, across the back of the game room, then an outside corner, and then finish up with a straight run across the north side.  This area will also have 3 downspouts.

Sometime this winter we need to make the wood vent to go in the peak of the area shown below.  It will be like the same vents that are on the garden shed and the south side of the house.  By adding this vent, it should help tie the new peak area in with the rest of the house.
Do not look at that mess under the deck.  

Reuse Repurpose Recycle

No comments:

Post a Comment

Leave a comment here.....