Thursday, June 6, 2019

The Rain has finally stopped...

...or so they (weather forecasters) say.  

We are inching closer to having the south side of the deck done. 

Here is the to do list....

Finish painting the shingles grey (just a few left)
Finish painting the white trim along the roof edge with semi gloss white
Take down the 3 inch eavestrough and downspout over the kitchen window
Replace 3 inch with 5 inch eavestrough and downspout
Prime and paint the area around the kitchen door
Paint corner trim board by kitchen door
Install bracket and hang small hanging basket
Retrieve the deck flower pots out of the barn loft
Plant the pots with flowers already purchased
Clean the glass table top, coffee table top, and end table top...3rd time's the charm
Remove the saw horses from the deck and put them down on the driveway
Take cushions to upholstery guy

Then there is the Mega To Do List

*Paint the shingles grey
*Paint the windows trim and sashes white (deck area)
*Prime the door trim (new door)
*Paint the door trim white
*Paint the doors white
*Make 4 of the faux wrought iron hinges
*Install the dummy handle on the stationary door
*Touch up the wrought iron furniture with black satin spray paint
*Take the outdoor cushions to the upholstery guy
*Hang 3 wrought iron baskets and plant with flowers 
*Haul out the umbrella and the umbrella stand
*Buy and plant flowers on the deck 
*Buy and plant flowers in the flower boxes on the railings
*Haul out all the deck decor items
*Put down the outdoor rug
*Plant flowers in the window boxes on the front and side of house
*Plant flowers in the pots on the front porch
*Fix paint on the bottom of the front door
*Add wide cove moulding to the bottom of front door
*Remove and replace 3" eavestrough and downspout with 5"
*Rent heavy equipment to break apart what remains of the swimming pool
*Call and get estimate for retaining wall in the backyard
*Cut down almost dead large pine tree
*Finish building gable vent and prime and paint it
*Install gable vent
*Sand and prime bistro set
*Drill holes in the seats and middle of table top
*Paint the bistro set satin black w/bk and wh check table top
*Buy opaque white stain for deck railings
*Stain deck railings white
*Dig up boulders
*Move a few boulders to the area next to the driveway wrought iron gates

R has spent a lot of the non raining hours using the lawn roller to level the dents in our side yard that the tracks on the excavator left imprinted in the sod.  We have had so much rain that the entire side yard has standing water.

No amount of rolling is going to help the backyard. 
The lilacs came and went in about 3 days because of the lower than average temps and the overly heavy rainfall.  I was really looking forward to cutting a big bouquet of lilacs.  I even purchased a large clear vase at Goodwill just for lilac cuttings. 

Maybe I will put peonies in that vase.  Probably not because they haven't even put out any buds yet. 
Go to my Instagram account to read about how an early 1900's glass dish (above photo) was shipped to me in a bag....yes, a non padded plastic bag. 

I think we are now all caught up.

Reuse Repurpose Recycle

No comments:

Post a Comment

Leave a comment here.....